Skip to content

Feature Matrix - Aug/Sep Roadmap

Historical — August 2026 snapshot

This is a frozen 2026-08-06 snapshot (its cycle model still refers to the now-past C10/C11). The live scope, priority, and status are the Project Timeline (Gantt) + 8-Week Lock Status and the reconciled feature pages. Kept for context.

Purpose: The single red/yellow/green plan for the first production launch and the August/September waves - the single source of truth for scope, priority, and status (see Feature Intake & Single Source of Truth). This is the tracker the team and Conor burn through. It sequences the Launch Gap Register into waves and folds in the Cara-AI-design forward modules. Companion page: Launch Readiness overview.

Last updated: 2026-08-06 (post deep-dive workshop; launch framing corrected). Live queue: filter Linear by the roadmap-epic label - each module row is a labeled epic.

Legend

🔴 not built, 🟡 partial / foundations done, 🟢 built (may still need UI polish), ⛔ deferred (post-pilot)

Launch framing (corrected)

The pilot is not live yet - the earlier "September launch / pilot go-live ~Jul 31" framing did not happen. The first production launch is an internal stealth pilot for two users - Jim (estimator) + Alex (PM) - scoped to the core Bid-to-Project workflow plus importing their existing data. It is gated on Smart Import stability (data corruption is the one true blocker) and a BC-sourced bid tested end-to-end (docs, takeoff, budget). Launch success = Jim and Alex import their real data with no corruption and run a bid end to end into a project without data loss.

Cycle model

  • C10 (2026-07-27 to 2026-08-09) = pre-launch lockdown / bug-fix (now closed). Focus was Smart Import hardening + BC E2E + the LAUNCH-critical gaps.
  • C11 (2026-08-09 to 2026-08-17) = current. Launch happens on QA happy-path sign-off (target the Tuesday 2026-08-11 QA sync + Conor demo), then production for Jim/Alex. Remaining bugs fixed in production while feature work resumes.
  • C12+ = Aug Wave-1 stabilization, September wave (Cara-AI-design forward modules), hardening. Mateo is out ~3 weeks in August, so the visual re-skin build lands on his return; the design review runs during August.

Estimation cadence

A major feature now spans multiple cycles (4+ weeks) with a QA loop - Marijana returns a feature 1-N times before it's done. No more mid-cycle scope changes. Estimates on the September wave reflect this; single-cycle "done" is the exception, not the rule.

Wave 0 - Launch (pre-pilot; go-live on QA sign-off)

The release scope. Everything here is BLOCKER or LAUNCH-critical; details + owners in the Gap Register. Go/no-go criteria are in the Launch Checklist.

Item Status Owner Launch-critical Epic / ref
Seed Jim & Alex accounts + their data 🔴 not done Marko + Marijana Yes (gate) -
Smart Import writes correct data 🟡 in flight Ivan B Yes (gate) PIN-678 (679-685), PIN-731, PIN-787
BC-sourced bid E2E (docs, takeoff, budget) 🔴 untested Marijana + Artem Yes (gate) -
Financial margin leak (a PM sees profit) 🔴 leak Marko Yes (gate) PIN-151
Proposal template rebuild (by-scope only) 🟡 mismatch Ivan B Yes PIN-134
Vendor RFP email stealth flags 🔴 not wired Marko + Artem Yes -
Delete confirmations app-wide 🔴 Frontend Yes -
Disabled-looking-but-clickable buttons 🔴 Frontend Yes -
AI takeoff symbol-group overlay bug 🟡 bug Artem Yes PIN-694
fail to fetch retries + cluster correlation 🔴 Marko Yes -
Bid-invite "Acknowledge" flow 🔴 Product / Ivan B Confirm w/ Conor -

Wave 1 - August stabilization + finish Daily Logs (C11)

Module Status Owner Epic Notes
Daily Logs - new design (HIGH) 🟡 in QA Mateo / Luka PIN-688 New design built (~85% by Mateo), now in QA. "Waiting on Conor's design" blocker cleared.
Daily Logs - interactive progress drawing 🟡 in progress Artem PIN-720 In progress today. Bring Conor A/B: A = mark progress in the log; B = full interactive CAD/PDF earned-value markup. Lock choice, then finish.
Vendor portal flow (role scoping) 🟡 partial Ivan B - Vendor sees too much today; full flow.
Competitors: conditional display + BC source 🟡 partial Ivan B - Show post-loss; investigate BC webhooks.
Bid-invite expiration alerts (QA + handoff) 🟢 exists Marijana - Dashboard + email exist; formalize.
Self-hosted error monitoring + AWS logs 🟡 partial Marko - Slack pod-crash alerts already live.
PO approval workflow retest 🟡 base done Artem PIN-137 (254/255/303) "Worked at some point"; retest+fix.
Apply-template zero-revision bug 🔴 bug Ivan B - Base revision with zeros appears.
UI consistency: bid vs project 🟡 partial Frontend PIN-687 (513/514/669) Toward the visual system.
Docs/drawings lifecycle diagram 🔴 Marko / Marijana - UML-ish map to avoid missing-link bugs.
Automated RFP + IMAP reply parser 🔴 Artem / Marko - Codilas has reusable code (~few days).
Long-running AI UX (streaming/bg notifications) 🟡 spinner only Marko / Mateo - White-label-critical; Redis queue for large files.

Wave 2 - September (Cara-AI-design forward modules)

Cloud Design is the visual reference for these. Each carries a dependency / Conor-blocked flag; visual tokens = navy #1C3340 / copper #C4956A / Nunito Sans + DM Mono numerals.

Top forward priority: Takeoff Engine (Conor's #1)

The base AI auto-takeoff pipeline is already shipped (PIN-295 spike Done + Phase-1 children: scale read, system detection, symbol groups, training-feedback tab). The September push is accuracy + the AI-first-measure-then-verify workflow. Priority is locked as #1 of the forward wave; velocity is gated on two Conor items - the clean drawing corpus (PIN-591, client-action) and sign-off on the self-hosted vision-model strategy (PIN-590 spike). This is not a fixed-date one-shot ship; it matures through the pilot into September+.

Module Priority Status Owner Effort Epic Dependency / Conor-blocked
Takeoff Engine - accuracy + AI-first verify #1 🟡 base shipped, accuracy push Artem XL PIN-694 (295/439-442/589) Gated: PIN-591 drawing corpus + PIN-590 VLM spike.
Visual system re-skin (page-by-page) High 🟡 partial Mateo M-L PIN-687 (513/514/669) Decision: pilot requirement or post-pilot? Mateo return; design review in Aug.
Compliance R1 (COI + rule engine + renewals) Med 🔴 not built Marko L+ PIN-7 (91/96/97/99/100/104/105) Confirm timing w/ Conor (was first priority, now Sep+).
Executive Dashboard (empty-state first) Med 🔴 stub - L PIN-60 / PIN-371 PIN-371 reactivation + financial adapter.
Master CO Log (analytics rollup) Med 🔴 not built - L PIN-61 / PIN-326 Spec PIN-326 owed by Conor.
WIP Report Low 🔴 not built - M PIN-690 Sage/Foundation job-cost sync.
Bid Targeting (4-factor score + relationship graph) Low 🔴 stub Ivan B XL PIN-14 / PIN-325 Spec PIN-325; external signal pipelines + legal review.

Daily Logs (new design + interactive progress drawing PIN-720) is not here - it is in Wave 1, finishing now. Floating Cara button is done (shipped). Sequencing note: within the Executive suite, ship Exec Dashboard empty-state + Master CO Log first (least blocked). The review-first Cara action pattern recurs across modules - build once, reuse. Field-level financial masking is a prerequisite for Exec Dashboard / WIP / Master CO Log.

Already built (pilot QA verifies)

Module Status Epic
Award, Project conversion 🟢 Done PIN-274
Proposal generation (PDF, markup, base-bid) 🟢 Done (template rebuild pending) PIN-134 (+631/665/609)
Bid list / Bid invites / Estimate sheet 🟢 Done (UI updates pending) PIN-6 stack
SharePoint bulk import + project pipeline 🟡 base done, Smart Import still writes wrong data (PIN-787) - launch gate, not "done" PIN-501/508/509/647/648, PIN-678, PIN-787
SOV (Schedule of Values) - separate AIA G702/G703 module 🟡 built but unreachable (line items only via broken Cara; needs manual add) -
Takeoff - base AI auto-takeoff pipeline (scale, system detect, symbol groups, training tab) 🟢 Done (accuracy push = Wave 2) PIN-295 (+439-442/589)
Floating Cara button 🟢 Done -

Deferred - post-pilot / Future

Module Reason Ref
⛔ Financials / Foundation integration Adapter limited until later; ship empty states now PIN-33 / PIN-373
⛔ Marketing / Bid-targeting live signals Lower priority; external pipelines need legal review PIN-518 / PIN-325
⛔ Full self-hosted takeoff vision model (custom-trained) GPU box; base pipeline shipped + accuracy push is Wave 2; full custom model is post-pilot PIN-694 (590/591)
⛔ Outbound bids Needs estimates dialed in; Sep/Oct -
⛔ Lead vs junior estimator perms + margin visibility White-label; Wave 2+ -
⛔ Dynamic per-tenant field schema White-label; no rebuild/redeploy per field -
⛔ AI Hub (tenant-specific AI training) Done outside the app for now -

Open decisions for Conor

The full list with our recommendations is in the Conor Briefing (§ What we need from you). Headline items on this roadmap:

  • Takeoff Engine (his #1): deliver the drawing corpus (PIN-591) + sign off on the VLM model strategy (PIN-590) - these gate velocity, priority is already locked.
  • Daily Logs progress drawing (PIN-720): pick A (mark progress in the log) or B (full interactive earned-value markup). Artem brings options.
  • Proposal template (Wave 0), visual-system timing (Wave 2), compliance timing (Sep), specs PIN-325/326, Exec Dashboard PIN-371, Azure Sites.Selected PIN-732, financial-integration timing PIN-33.
  • Process: adopt the single source of truth + capture, review, lock, build intake gate (Feature Intake).