Bid Day Mode / mobile 'Bid day' view¶
| Stage | Backlog |
|---|---|
| Status | Deferred |
| Design status | In progress |
| Estimate | S |
| Linear status | no ticket |
| Design | Design ↗ |
| Linear epic | Bid Intake & Pipeline |
| Module | Bids ↗ |
No Linear issue
No matching Linear ticket exists as of 2026-08-25 — this feature is tracked in the spec only. Open a Linear issue before build; until then this spec page is the source of truth.
Priority: Low
Conor's comments¶
[8/18 DESIGN] Bid Day Mode stays inside Outreach & RFP on the bid record; the "single Vendors tab" plan is superseded. This will be combined into a single vendors tab.
Notes¶
No row anywhere names a mobile bid/outreach screen, and this sheet does track mobile surfaces at row level when they exist (ROW 3 daily-log mobile field capture, ROW 60 Cara Field Mode), so the chase