Project Detail - Insurance (project COI tab)

StageEstimated
StatusDeferred
Design statusMissing
Estimate3w (L+)
ConfidenceLow
LinearPIN-59 ↗ PIN-7 ↗
Linear statusBacklog
DesignMISSING — no design canon
Linear epicProject Management & Controls
ModuleProjects ↗

Priority: Medium

Scope

Project-scoped Insurance tab on Project Detail: a COI compliance table for every vendor on the project, with status derivation and a summary count bar. Ties into the company-wide Insurance/Compliance master rather than standing alone. (Source: PIN-59, PIN-7.)

Acceptance criteria

  • One row per project vendor: Vendor Name, COI Status, GL Limit, WC Limit, Expiry Date, status icon
  • Status values: compliant, expiring soon (within 30 days), non-compliant, expired, missing — each with a distinct icon
  • Summary bar: counts of compliant / non-compliant / missing / expiring
  • Click a vendor row to open its vendor detail
  • Empty state: "No vendors with insurance data on this project"
  • Tier-2 epic (PIN-7) — deprioritized; client noted insurance has the least valuable data of the compliance surfaces

Conor's comments

This ties directly intoInsurance / Compliance master . Should not be separate.

Notes

Design canon project tab #14; cross-ref Insurance master. Schema only in monorepo

Open question for Conor

  • Design canon MISSING — no .dc.html maps to this page. Confirm the design source: reuse an existing module export, or schedule a dedicated design pass? (F2) Confirm timing (Sep or later)