Skip to content

Project Detail - Field & Project Controls build-out (hardening)

StageEstimated
StatusDeferred
Design statusIn progress
Estimate2w (L)
ConfidenceLow
LinearPIN-691 ↗ PIN-140 ↗ PIN-500 ↗
Linear statusTodo · +2 backlog
DesignDesign ↗
Linear epicField Operations
ModuleDaily Logs ↗

Priority: Medium · Route: /projects/:id/detail?tab=field

Scope

Field & Project Controls build-out: an Equipment Schedule section, templated Safety forms (NYC DOB Daily Pre-Task + Weekly Toolbox Talk) with crew roster and signature capture, a Punch List with drawing-pin integration, and closeout — hardening the remaining Field-tab controls. (Source: PIN-691, PIN-500, PIN-140.)

Acceptance criteria

  • Equipment Schedule section added under Project Controls
  • Safety sub-tab: foreman selects a form from a template library (Daily Pre-Task, Weekly Toolbox Talk), adds workers by name, captures signature per worker
  • Completed safety forms are viewable/retrievable per project as a compliance record
  • Punch List tab: item creation (location, description, responsible party, photo, priority), optional pin to a drawing location
  • Punch List status workflow Open → In Progress → Complete → Verified, with ball-in-court assignee tracking
  • Punch List batch operations (mark complete, reassign), PDF export, and a % complete dashboard

Conor's comments

This is mostly the progress drawings, punchlist and tablet/iphone users.

Notes

Controls hardening; design deletes Field tab (children promoted)

Open question for Conor

Your prototype shows layers/zones/safety approvals not yet documented - confirm scope