Time-clock feed integration (crew count, 88 labour hours, 7:00a-3:30p shift)¶
| Stage | Backlog |
|---|---|
| Status | Deferred |
| Design status | In progress |
| Estimate | M |
| Linear status | no ticket |
| Design | Design ↗ |
| Linear epic | Field Operations |
| Module | Daily Logs ↗ |
No Linear issue
No matching Linear ticket exists as of 2026-08-25 — this feature is tracked in the spec only. Open a Linear issue before build; until then this spec page is the source of truth.
Priority: Low
Conor's comments¶
Feeds daily-log capture
Notes¶
Grep of all 110 rows finds no time clock / timesheet / labour-hours source; ROW 58 is crew scheduling, not a feed, and other integrations (ROW 65 Procore, ROW 104 BuildingConnected) each get their own