Skip to content

Project Detail - Field: Reports (daily-log reports)

StageBuilt
StatusShipped
Design statusIn progress
EstimateS
ConfidenceMedium
LinearPIN-470 ↗ PIN-27 ↗ PIN-911 ↗
Linear statusDone
DesignDesign ↗
Linear epicField Operations
ModuleDaily Logs ↗

Priority: High · Route: /projects/:id/detail?tab=field&subtab=reports

Scope

Daily Log reporting view: filter logged categories by date range and export as a full PDF report or a single-category CSV/PDF, scoped to the selected range. (Source: PIN-470, PIN-27, PIN-911.)

Acceptance criteria

  • Date range picker (From/To) filters all categories (Manpower, Delays, Work Performed, Safety, Materials, Notes, Photos) server-side
  • Selected date range persists when switching between category tabs
  • Export full Daily Log report as PDF for the selected date range, one section per category
  • Export a single category as PDF or CSV for the selected date range
  • PDF exports include company branding (logo, project name/number, date range header)
  • Photos listed as filenames in PDF exports, not embedded images
  • Day sections in PDF exports are in chronological order
  • Loading state during export; error toast on failure

Conor's comments

Need to finalzie design. Will be tested post 8/19

Notes

-

Open question for Conor

-