Project Detail - Team¶
| Stage | Built |
|---|---|
| Status | Shipped |
| Design status | Missing |
| Estimate | S |
| Confidence | Medium |
| Linear | PIN-231 ↗ |
| Linear status | Done |
| Design | |
| Linear epic | Project Management & Controls |
| Module | Projects ↗ |
Route: /projects/:id/detail?tab=team
Scope¶
Team tab on Project Detail: assign/remove internal team members on a project and surface the project's key external parties. (Source: PIN-231.)
Acceptance criteria¶
- Add / remove team members from the project (links existing users)
- Displays member role and assignment date
- PM assignment dropdown filtered to PM-category roles
- "Key Parties" section: contracting counterparty, client, property manager, owner's rep
- Search/filter team members by name or role
Conor's comments¶
Needs testing & sign off after 8/19
Notes¶
-
Open question for Conor¶
- Design canon MISSING — no
.dc.htmlmaps to this page. Confirm the design source: reuse an existing module export, or schedule a dedicated design pass? (F2)