Addenda distribution - Cara drafts the re-issue, a person sends¶
| Stage | Estimated |
|---|---|
| Status | Deferred |
| Design status | In progress |
| Estimate | M |
| Confidence | High |
| Linear status | no ticket |
| Design | Design ↗ |
| Linear epic | Bid Intake & Pipeline |
| Module | Bids ↗ |
No Linear issue
No matching Linear ticket exists as of 2026-08-25 — this feature is tracked in the spec only. Open a Linear issue before build; until then this spec page is the source of truth.
Priority: Medium
Conor's comments¶
Addenda re-issue distribution. Coupling risk: an addendum can move scope lines after the scope sheet was read (Add.3 moved M-401/M-501 risers on the fixture). Ruled "build it" 8/18, held. [priority proposed - adjust]
Notes¶
Design: docs/phase-15/panel-log.md (15b/15c). Conor rulings 2026-08-18.